cell cranes
Our free-standing manual top running cell cranes are ideal for welding stations, assembly cells, machining centers and more. Bridge is designed to move easily under load. All structural steel, this crane is designed for heavy duty applications.

Bridge lengths are 10, 15 and 20 ft. Bridge includes tagline. Standard heights under beam (HUB) are 12 and 14 ft. Runway lengths are 10, 15 and 20 ft. lengths. Runways are easily expandable by simply removing the end stops—bolting beams to columns and replacing end stops.


Need to do a custom application or design? Contact us for a quote.

 

CAPACITY
LBS
MODEL # BRIDGE SPAN

RUNWAY LENGTH

HUB BRIDGE BEAM FLANGE WEIGHT
2,000 CC1010-12 10′ 10′ 12′ 5 ¾" 2,285 #
2,000 CC1015-12 10′ 15′ 12′ 5 ¾" 2,579 #
2,000 CC1020-12 10′ 20′ 12′ 5 ¾" 2,873 #
2,000 CC1010-14 10′ 10′ 14′ 5 ¾" 2,481 #
2,000 CC1015-14 10′ 15′ 14′ 5 ¾" 2,775 #
2,000 CC1020-14 10′ 20′ 14′ 5 ¾" 3,069 #
CAPACITY
LBS
MODEL # BRIDGE SPAN

RUNWAY LENGTH

HUB BRIDGE BEAM FLANGE WEIGHT
2,000 CC1510-12 15′ 10′ 12′ 5 ¾" 2,415 #
2,000 CC1515-12 15′ 15′ 12′ 5 ¾" 2,709 #
2,000 CC1520-12 15′ 20′ 12′ 5 ¾" 3,003 #
2,000 CC1510-14 15′ 10′ 14′ 5 ¾" 2,611 #
2,000 CC1515-14 15′ 15′ 14′ 5 ¾" 2,905 #
2,000 CC1520-14 15′ 20′ 14′ 5 ¾" 3,199 #
CAPACITY
LBS
MODEL # BRIDGE SPAN

RUNWAY LENGTH

HUB BRIDGE BEAM FLANGE WEIGHT
2,000 CC2010-12 20′ 10′ 12′ 5 ¾" 2,545 #
2,000 CC2015-12 20′ 15′ 12′ 5 ¾" 2,839 #
2,000 CC2020-12 20′ 20′ 12′ 5 ¾" 3,133 #
2,000 CC2010-14 20′ 10′ 14′ 5 ¾" 2,741 #
2,000 CC2015-14 20′ 15′ 14′ 5 ¾" 3,035 #
2,000 CC2020-14 20′ 20′ 14′ 5 ¾" 3,329 #

 

Runway Adder (Includes the items below)
  • (2) runway beams
  • (2) support columns
Optional Runway Electrification (Includes the items below)
  • C-Track
  • Trolleys
  • 12AWG-4 cond. flatwire
  • Web mount brackets
  • All necessary hardware
MODEL # RUNWAY LENGTH HUB WEIGHT
CCRW-10-12 10′ 12′ 1,156 #
CCRW-15-12 15′ 12′ 1,450 #
CCRW-20-12 20′ 12′ 1,744 #
CCRW-10-14 10′ 14′ 1,254 #
CCRW-15-14 15′ 14′ 1,548 #
CCRW-20-14 20′ 14′ 1,842 #

 

NOTES:

  • One 1 Ton Bridge per cell bay only.
  • Consult a professional engineer to assure all local codes and ordinances are met. Bracing to building for additional rigidity by others if desired.